A stalled sign-off usually has a paper problem and an engineering problem tangled together. The previous agency may have done good work that was never filed properly, or filed reports that do not say what the jurisdiction needs, or missed inspections that now have to be reconstructed from what is visible.
We untangle it in that order. First the record: what exists, what it supports, what the jurisdiction will accept. Then the gaps: which can be closed with an engineering evaluation, which need a new inspection or a test, and which need investigation. Then the filings. Open violations are handled the same way, as engineering problems with a submission at the end.
This work draws on everything else we do, which is why we can usually say within the first review what it will take and what it will cost as a fixed scope.