Civil and site work rounds out the other disciplines: the geotechnical report feeds the stormwater design, the structural work needs a site to sit on, and the permit needs all of it to agree. We keep the civil scope tightly coordinated with the rest so the application moves through review on the first pass.
We take civil work two ways. On small and mid-size sites — an addition, a parking area, a lot grading plan, a drainage problem, stormwater for minor development — we are the site engineer of record. On larger projects, our civil team works alongside the geotechnical and structural work we are already carrying, or supports the civil engineer of record. Either way the grading, the drainage, the soils, and the structure come out of one office and agree with each other the first time.